| Morning Advances in
Digital Substation Equipment Development
 | Digital Protection Designs |
 | Digital Control System Designs |
 | Digital Monitoring and Metering System Designs |
 | Instrument Transducers |
 | Local Area Networks |
 | Fiber-Optic Communications |
Afternoon
Functional Requirements for Substation Monitoring, Control and Protection
 | Functions |
 | Time Response Requirements |
 | Sampling Rate Requirements |
 | Algorithm Requirements |
 | Functional Co-ordination |
 | User Interfacing |
 | Data Base Requirements |
|
Morning Distribution of
Substation System Architecture and Allocation of Functions
 | Hierarchical Functional Organization |
 | Distributed Substation Computer System Architecture |
 | Allocation of Functions |
 | Functional Co-ordination/ Integration |
 | Implementation Requirements |
 | Example: Breaker- and- a- half Substation Switchyard Design |
Afternoon
Examples of Digital Substation System Designs
 | Historic Prospective: WESPAC System Design |
 | SIEMENS Design |
 | ABB Design |
 | GEC/ALSTHOM Design |
 | GE Design |
 | TASNET Design |
 | Utility Substation Initiative/EPRI Design in the USA |
|